Energy UNITS FOR DOUBLE-SCISSORS LIFT

Basic Description
Outfitted using the zero leak bidirectional checking sole-noid valves, this electrical power unit is built for your operation of two independent circuits. Which are respectively for that main and subordinate platforms from the double scissors lift. Two cut-off valves are utilized for decreasing the machine manually in case of energy reduction. If more independent circuits are needed for the application please contact us for availability.
Remark: 1. Please consult our product sales engineer for that distinct pump displacement, motor electrical power or tank capacity.
two. CSA or UL certified motors are available upon request.
Special Notes
1. The AC motor is of S3 duty cycle, which may only perform intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean the many hydraulic components concerned prior to installation of the energy unit.
3. Viscosity of your oil shoud be 15~46 cst,as well as the oil need to be clean and free of impurities,N46 hydraulic oil is suggested.
four. The electrical power unit need to be mounted vertically.
5. Check the oil level in the tank after the initial working of the power unit.
6. Oil changing is needed following the initial 100 operation hrs,afterwards when every 3000 hrs.